LEYI® R&D · Manufacturing · Quality

How we develop, make and test our resins

From resin production and filling to test prints and property testing, see the real floor and lab work behind every bottle we ship.

  • Materials R&D
  • Standardized production
  • Print and property testing
LEYI 3D printing resin production floor

Manufacturing

Six real steps in making and testing

Beyond the spec sheet, here is how we produce, fill, print and test our resins, from manufacturing to application testing.

  1. LEYI resin production equipment

    01Production equipment

    Used to formulate and produce our resins. Production lots, packaging and shipping documents are confirmed per project.

  2. LEYI resin production in progress

    02Production

    The actual production steps, from formulation through pre-packaging prep.

  3. LEYI resin filling

    03Filling

    Resin is filled to each product’s spec. Net volume, case pack, labels and OEM requirements are confirmed per project.

  4. LEYI resin test printing

    04Test printing

    We test print performance on a defined printer, wavelength, layer thickness and exposure, as a baseline for matching print settings.

  5. LEYI resin property testing

    05Property testing

    We evaluate material properties based on test conditions, specimens and results. For actual values, see each product’s technical documents.

  6. Parts printed in LEYI resins

    06Sample parts and application testing

    Real printed parts show structure, surface and fit for the application. We judge suitability against your printer and post-processing setup.

Project Requirements

Four things to confirm before you buy

Settings, inspection items and documentation can differ by product and project. Tell us your product, printer, document needs and delivery requirements, and we’ll take it from there.

  • 01

    Product and lot

    Model, color, packaging, production lot and delivery details.

  • 02

    Printing and post-processing

    Printer, wavelength, settings, wash and post-cure conditions.

  • 03

    Performance and documents

    Test conditions, TDS/SDS status and target-market requirements.

  • 04

    Delivery and traceability

    Final inspection, lot records, shipping documents and after-sales records.

Certificates, inspection items, lot traceability and publishable documents must be confirmed item by item for the specific product, market and project. Equipment and facility photos do not represent certification or performance claims.

Questions about printer compatibility, workflow or documents?

Tell us your product, printer, application and target market. Our sales team will work with you on resin selection and validation requirements.